CASE STUDY:
International Food Manufacturer
A major international food producer was looking to install 2 new production lines within there factory. The requirements were to be able to work within the factory without impacting on production or hygiene.
TCS (UK) had previously carried out a seamless energy saving lighting and emergency lighting upgrade program across the site, both internally and externally. This gave the client the confidence to use TCS (UK) to design and install the new distribution requirements for there 2 new production lines.
The installation consisted of a new 800amp MCCB Panel supplied from existing LV Switchgear and new distribution boards and containment to upgrade the area to allow for future expansion within the site. The project in total came to approx 2 months from start to completion
CASE STUDY
St Bartholomews The brief was to brighten the church and highlight the beautiful stained glass windows and other stunning features. |